Oil-Free Compressor Installation and Commissioning

Plan the room and system around the selected package before shipment.

Oil-Free Compressor Installation and Commissioning
Catalogue-derived visual supporting Oil-Free Compressor Installation and Commissioning.

Mechanical installation

Confirm operating and shipping weight, foundation load, leveling, lifting points, service clearances and access for heat exchangers, filters and major components. Support piping independently and prevent nozzle load. Route drains to an appropriate collection point and protect against freezing.

Cooling and ventilation

Air-cooled packages need a documented intake and hot-air discharge path without recirculation. Water-cooled packages need defined flow, pressure, inlet temperature, water quality and fouling control. Verify heat rejection against room ventilation or cooling-tower capacity.

Electrical and controls

Verify voltage, phase, frequency, protective devices, earthing, cable size, short-circuit rating, motor/VFD settings and remote signals. Test emergency stop, alarms, permissives, automatic restart policy and sequencing.

Commissioning record

Record inlet conditions, pressure, temperature, FAD or downstream throughput, vibration, noise, dew point, filter differential pressure, drains and control response. For a PSA oxygen plant, include oxygen purity, flow, alarms and backup-supply changeover.

Send the duty point, air-quality target and site conditions

We will map the requirement to catalogue-supported configurations and identify the information that still needs an approved engineering drawing.